Built to the north of the village between 1981 and 1982, the cutting at maximum was 92 feet deep. This photograph shows machinery and excavators removing chalk from where the deepest cut was made which was then transported to the area where the Roke Road passed to build up the level across the river plain. This process alone took about six months.
Click
here for the full sized image
Photograph courtesy of John Pittfield